A片粗大的内捧猛烈进出AVV_国产精品成人精品久久久_狼群社区在线看片_熟女精品视频一区二区三区_任你躁一区二区久久99_97精品一区二区三区

How to realize good explosion-proof performance of liquid ammonia emergency shut-off valve?

Time:2021-09-17
Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 亚洲国产精品久久久久婷婷软件 | 久久久久久久99 | 麻豆av福利av久久av | 欧美日韩一区二区精品 | 亚洲宅男天堂在线观看无病毒 | 无码欧精品亜州日韩一区夜夜嗨 | 欧美亚洲另类图片 | 亚洲h在线播放在线观看h | 国产浴室后入懂色 | 国内精品久久久久精品 | 99热这里只有精品5 在线观看一区二区精品视频 | 亚洲国产欧美日韩在线精品一区 | 三级黄色a级片 | 自拍偷拍麻豆 | 深夜福利在线免费观看 | 亚洲国语 | a级亚洲 | cao视频| 亚洲欧洲国产精品香蕉网 | 一区在线免费观看 | 粗大的内捧猛烈进出无码 | 91精品久久久久久久久久另类 | FREE性欧美媓妇喷水 | 亚洲伊人无码一区二区三区 | 激情在线小说图片视频区 | p色视频免费在线观看 | 久久激情五月丁香伊人 | 日本三级吃奶头添泬 | 国产一区二区三区四区五区传媒 | 尤物丰满少妇大尺度喷血写真 | 男人操女人的免费视频 | 久久久精品| 中国一级簧色带免费看 | 国产在线高清观看 | 国产精品天美传媒沈樵 | 日韩欧美大片在线观看 | 秦岭神树动漫版免费看 | 99情趣网视频 | 激情久久中文字幕 | 偷偷干夜夜拍 | 天堂V亚洲国产V第一次 |